Renovations, extensions, second-storey additions, and dual occupancy on qualifying lots. We offer design-and-construct and construct-only delivery, managing the process from initial site visit through design development, DA lodgement, build, and handover.
Most Leichhardt residential streets fall within Heritage Conservation Areas under Inner West LEP 2022 Schedule 5. Extensions, structural changes, and most external alterations require a DA through Inner West Council. CDC fast-track is generally not available in these areas.
Leichhardt also has wider lot sizes than many neighbouring Inner West suburbs. Blocks in parts of the suburb can support more substantial additions, including larger rear extensions or dual-storey builds, than the narrower peninsula sites in Balmain and Rozelle. If you are working out what your site can support, a planning assessment at the start of the process is worth doing.
In most cases, yes. Leichhardt has significant Heritage Conservation Area coverage under Inner West LEP 2022. Extensions, second-storey additions, and structural changes to properties in these areas require a DA through Inner West Council. We clarify the correct pathway at the first meeting.
Yes. Federation bungalows, Californian bungalows, and interwar semis make up a large share of our Inner West residential work. These buildings have specific structural characteristics and heritage constraints that affect how extensions are designed and built. We know this type of stock well.
Most Leichhardt residential properties fall within Heritage Conservation Areas under Inner West LEP 2022 Schedule 5. Works that affect the exterior or structure of the building require council consent. The design must respect the heritage character of the street, which influences materials, form, and how additions relate to the existing building.
Yes. Second-storey additions are achievable on many Leichhardt lots. The approach depends on the structural capacity of the existing building, the heritage constraints, and the lot size. We work with architects to design within those constraints and manage the DA process.
The Heritage Conservation Area designation means most external changes require council consent through a Development Application. CDC fast-track is not available. The heritage controls affect visible changes to the building, including materials, openings, and the form of any additions. Internal works may have more flexibility, depending on the specific listing.
Residential renovation and extension costs vary depending on scope, site conditions, and finishes. Mid-range residential work in the Inner West typically runs between $5,000 and $8,000 per square metre for an extension. More complex projects involving structural changes or high-spec finishes will sit above that range. We provide a detailed cost breakdown at the quoting stage.
Construction on a renovation or extension runs 3-9 months on site depending on scope. A more complex project involving structural changes or a second storey can take longer. Allow 3-6 months for the DA process before construction starts. We build realistic programmes and advise on timing at the quoting stage.