Renovations, extensions, second-storey additions, and duplex builds on qualifying lots. We offer design-and-construct and construct-only delivery, managing the process from initial site visit through design management, DA lodgement, build, and handover.
The Inner West LEP 2022 Schedule 5 covers a high proportion of Marrickville’s residential streets. Properties within these Heritage Conservation Areas require council consent for most external changes and structural alterations. CDC fast-track is generally not available. If your property is within a conservation area or is listed, a DA through Inner West Council is the expected pathway.
Heritage work is where our approach to traditional workmanship makes the most difference. Original brickwork, period joinery, and existing structural elements are things we work with carefully, not strip out. Where existing materials can be retained and repurposed, we do that.
In most cases, yes. Marrickville has a high concentration of Heritage Conservation Areas under Inner West LEP 2022. Extensions, second-storey additions, and structural changes require a DA through Inner West Council. Minor internal works may qualify as exempt development, but anything affecting the exterior or structure typically needs consent. We advise on the correct pathway at the first meeting.
Properties within a Heritage Conservation Area need council consent for most external changes, including extensions, new openings, and alterations to the roof form or facade. CDC fast-track is not available in these areas. The design must be sympathetic to the heritage character of the street, which affects the materials your architect specifies.
Some Marrickville lots are zoned to allow dual occupancy under Inner West LEP 2022. Whether a duplex is achievable depends on your zoning, lot size, and any heritage or conservation area constraints. We advise on what’s possible based on current planning rules before design work starts.
Yes. Double-storey additions are common in Marrickville, particularly on larger lots. They typically require a DA, and if the property is within a conservation area, the design needs to address heritage considerations. We work with architects to manage this process from planning through to handover.
Construction on a renovation or extension typically runs 3-9 months on site depending on scope. A second-storey addition at the complex end can take longer. Add 3-6 months for the DA process before construction starts. We give you a realistic programme at the quoting stage.
Most of our Marrickville work is on Federation cottages, Californian bungalows, interwar semis, and Victorian terraces, many of which fall within Heritage Conservation Areas. We also take on commercial and hospitality projects in the suburb.
Asbestos-containing materials were commonly used in homes built before 1987, particularly in fibrous cement sheeting, eaves, and floor underlays. Pre-1970 Marrickville properties are likely to contain some. Removal must be carried out by a licensed removalist. We identify asbestos early in the scoping process and factor removal into the programme.