Terrace renovations, rear and upper extensions, second-storey additions, and commercial and hospitality fitouts. We offer design-and-construct and construct-only delivery, managing the process from site visit through DA, build, and handover.
The Newtown Conservation Area is one of the largest under Inner West LEP 2022 Schedule 5. Works affecting the exterior or structure of a property within the conservation area require a DA through Inner West Council. CDC fast-track is generally not available. The requirement covers extensions, new openings, rear additions, and second-storey work.
Victorian terrace renovation is where our approach to traditional workmanship matters most. Narrow blocks, load-bearing party walls, and heritage facades impose constraints on what’s structurally possible. We work with architects who understand this environment and have done enough of these projects to anticipate where the common problems arise.
Yes. Rear extensions, upper-floor additions, and internal reconfiguration are achievable on Newtown terrace sites. The scope depends on your block width, the heritage constraints on your specific property, and how much of the rear garden or light well you can give up. A site visit is the right starting point.
In most cases, yes. Properties within the Newtown Conservation Area require council consent for external changes, including rear additions. CDC fast-track is generally not available. The heritage controls affect the materials, the form of the addition, and how it relates to the existing building. We advise on the DA pathway at the first meeting.
Most Newtown properties fall within the Newtown Conservation Area under Inner West LEP 2022 Schedule 5. Council consent is required for most external changes. The design must be sympathetic to the heritage character, which typically means respecting the street facade, using appropriate materials, and limiting how visible any new additions are from the street.
Yes. Shared party walls are standard on Newtown terrace sites. We manage the survey, structural work, and any party wall coordination as part of the build process. It adds a layer of planning, but it is work we do regularly.
Construction on a renovation or extension typically runs 3-9 months depending on scope. For a second-storey addition or complex rear extension, the build phase can extend to 12 months. Add 3-6 months for the DA process before construction starts. We give a realistic programme at the quoting stage.
Yes, though the scope depends on the structural capacity of the existing building and the heritage constraints. Second-storey additions on heritage terraces typically need to be set back from the street facade so they do not dominate the streetscape. We work with the architect to design within those constraints.
Narrow Newtown terrace sites affect access for trades, materials, and waste removal. Crane lifts for steel or heavy materials are sometimes required. Party wall coordination adds time. The design has fewer spatial options than a wide block. All of these are things we plan for from the start, not problems we manage when they arrive.